  • High-Altitude Cooling Tower Selection: What Overseas Buyers Should Put in the RFQ

    Direct answer: For evaporative (wet) cooling towers, site altitude mainly changes air density and fan/motor conditions—not a simple “cut capacity X%” rule you can invent from a catalog page. Enter the project elevation (or barometric pressure) in the manufacturer selection, and treat dry or adiabatic coolers differently from wet towers. Do not paste a sea-level model number onto a high-elevation site without a factory re-selection.

    THERMIVON is the overseas brand of Jiangxi Zhaorin Heat Transfer Technology Co., Ltd. This article is a buyer checklist for overseas RFQs. It does not replace a project-specific thermal selection.

    What actually changes at altitude

    • Air density falls as barometric pressure falls. Fans still move roughly the same volume at a fixed speed, but mass flow drops.
    • Evaporative (wet) towers reject heat primarily toward the entering wet-bulb temperature. Industry manufacturer guidance states evaporative capacity is not simply derated the same way as dry coolers when altitude rises; lower barometric pressure can aid evaporation. Still, the selection must use the real site wet-bulb and pressure/altitude inputs.
    • Dry and adiabatic coolers reject heat toward dry-bulb / process air-side duty. Lower air mass flow typically reduces capacity at altitude unless the selection accounts for it.
    • Motors: Many motor standards assume ratings near or below about 1,000 m. Above that elevation, cooling of the motor itself can be affected—confirm the motor supplier’s altitude rating instead of assuming a catalog nameplate is enough.

    Public manufacturer reference used here: SPX Cooling / Marley expert opinion white paper on altitude effects for heat-rejection equipment (evaporative vs dry/adiabatic contrast, motor note): https://spxcooling.com/wp-content/uploads/WP-HR-251.pdf. Fan affinity / density relationship background is also discussed in SPX educational notes such as H-001B.

    Where a generic altitude “percent derate” goes wrong

    Buyers sometimes ask for a single percentage to shrink a sea-level catalog rating. That shortcut is unsafe because:

    • Wet vs dry/adiabatic equipment respond differently.
    • Approach, range, and design wet-bulb still dominate wet-tower thermal balance.
    • Fan speed control, static pressure, and motor altitude class are separate from fill thermal rating.
    • Published THERMIVON catalog ratings on the website are tied to stated sample conditions (including a stated atmospheric pressure on factory data sheets). If your site pressure differs materially, the model must be re-run—not verbally “guaranteed” equal.

    RFQ information checklist (altitude projects)

    • City / site elevation (m or ft) and/or design barometric pressure
    • Design entering wet-bulb (and dry-bulb if dry/adiabatic is considered)
    • Hot / cold water (or process fluid) temperatures and flow or heat load
    • Open-circuit vs closed-circuit preference (process fluid isolation needs)
    • Power supply, fan control (across-the-line / VFD), and any motor altitude class requirement
    • Noise limit and measurement basis if applicable

    Product paths on this site (start points, not substitutes for selection)

    Related reading already on the blog: Open-Circuit vs Closed-Circuit Cooling Towers. For a formal quotation path: Get a Quote.

    What we are not inventing here

    This draft does not publish a proprietary THERMIVON altitude derate table, CTI letter numbers for a specific altitude project, or unnamed customer cases. Those require project data and factory confirmation.

  • Approach and Range in Cooling Tower Selection for Overseas Buyers

    Quick Answer: Cooling tower size is driven by approach (cold-water temperature minus entering wet-bulb) and range (hot-water temperature minus cold-water temperature), together with water flow and site wet-bulb. Catalogue models rated at a fixed reference condition still need reselection when your process temperatures or wet-bulb differ.

    Overseas B2B buyers often receive a quotation based on a standard duty such as 37/32/28 °C. That string is hot water / cold water / wet-bulb. The 5 °C gap between 37 and 32 is the range; the 4 °C gap between 32 and 28 is the approach. Changing either value changes the required tower—even when flow (m³/h) stays the same.

    What Approach and Range Mean on a Project

    Range is set by the process: how much the water must be cooled between return and supply. A wider range means more heat rejected per cubic metre of water, but it also changes fill and fan duty. Do not stretch range on paper just to shrink flow without checking pump and process constraints.

    Approach is how close cold water gets to the entering wet-bulb. A tighter approach (for example aiming for cold water only 3 °C above wet-bulb instead of 4–5 °C) needs a larger tower or more cells for the same flow. Evaporative towers cannot cool water below the entering wet-bulb; approach is the practical margin above that physical limit.

    Why Catalogue Ratings Are Not Plug-and-Play

    Many open-circuit and closed-circuit lines are designed per CTI methods and published at a reference duty so buyers can compare vendors. That reference is a common language, not a guarantee for your site. If your cold-water target is lower, your wet-bulb is higher, or your range is narrower, ask for a thermal reselection rather than scaling a catalogue model by flow alone.

    Buyer inputWhat it controlsWhat to send the vendor
    Hot / cold water (°C)Range and target cold waterProcess supply and return temperatures at design load
    Design wet-bulb (°C)Approach and summer peak sizeSite design wet-bulb and basis (e.g. 1% exceedance)
    Water flow (m³/h)Heat rejection with rangeDesign flow and whether parallel trains exist
    Altitude / pressureAir density and evaporative performanceSite elevation (m) or design barometric pressure
    Noise / footprint limitsFan speed, cell count, layoutSound target at a stated distance; plot constraints

    Practical Checks Before You Freeze the Model

    1. Write approach and range explicitly next to the hot/cold/wet-bulb string so every party uses the same numbers.
    2. Confirm whether the quoted model was selected at your site wet-bulb or only at a catalogue reference.
    3. If the process can accept a slightly higher cold-water temperature in peak summer, say so—relaxed approach often reduces capital cost more than chasing a tiny flow change.
    4. Keep water quality and make-up source in the same RFQ; fouling and blowdown affect long-term approach even when the thermal sheet looks fine on day one.
    5. Ask for the selection basis on the datasheet (wet-bulb, altitude, fouling allowance) so commissioning teams can verify performance later.

    How THERMIVON Uses These Inputs

    THERMIVON China sizes industrial open- and closed-circuit cooling towers from the duty you provide—not from a generic brochure pick. Send hot water, cold water, design wet-bulb, flow, altitude, and any noise or layout limits. We return a thermal selection and layout options so EPC and plant teams can compare approach, range, and cell arrangement on equal footing.

    Need a quick check of approach and range for an overseas project? Share the duty data with the THERMIVON team at apextowerchina.com and we will confirm whether a catalogue reference model still fits your site.

  • Wet-Bulb Temperature and Cooling Tower Selection for Gulf Projects

    Quick Answer: Cooling tower capacity depends on entering wet-bulb temperature. Gulf and other high-humidity coastal sites often need larger towers or different models than selections based on a standard 28 °C wet-bulb rating.

    Many catalogues quote performance at a reference condition such as 37/32/28 °C (hot water / cold water / wet-bulb) and 99.4 kPa. That reference is useful for comparison, but it is not a substitute for project-site weather data. Buyers who copy a catalogue model without checking local wet-bulb risk under-sizing in summer peaks.

    Why Wet-Bulb Matters More Than Dry-Bulb

    An evaporative cooling tower rejects heat mainly by evaporation. The approach (cold water temperature minus wet-bulb) sets how hard the tower must work. Dry-bulb alone does not define that limit. Two sites with the same dry-bulb can need different tower sizes if humidity—and therefore wet-bulb—differs.

    Input Why It Matters What to Send THERMIVON
    Design wet-bulb Sets approach and required tower size Site design wet-bulb (°C) and design basis (e.g. 1% exceedance)
    Hot / cold water temperatures Defines range and approach Process supply and return temperatures
    Altitude / barometric pressure Affects air density and evaporative performance Site elevation (m) or design pressure (kPa)
    Peak summer duty Catalogue rating may understate peak load Maximum heat rejection and coincident wet-bulb
    Water quality Make-up and cycles of concentration affect fouling and blowdown Make-up source (municipal, treated, seawater) and TDS if known

    Practical Selection Steps for Overseas Buyers

    1. Obtain a credible design wet-bulb for the plant city—not a national average and not a dry-bulb from a weather app.
    2. State whether the catalogue 37/32/28 °C rating is only a reference; ask for reselection at your site wet-bulb.
    3. Confirm altitude so the vendor can adjust for air density.
    4. Decide open vs closed circuit based on process water cleanliness and fouling risk, not wet-bulb alone.
    5. Ask for engineering review before freezing model numbers on an RFQ.

    Common Mistakes to Avoid

    • Selecting only from a standard wet-bulb rating when the project is in a humid coastal or Gulf climate.
    • Using dry-bulb as if it were wet-bulb.
    • Ignoring altitude when comparing towers from different vendors.
    • Assuming “designed per CTI methods” means the unit is certified for every site condition—methods define how performance is calculated; site data still drives the selection.

    What to Include in Your First RFQ

    Send flow rate, hot and cold water temperatures, design wet-bulb, altitude, open or closed preference, make-up water type, noise limits if any, and Incoterms. THERMIVON can then reselect against your duty instead of shipping a catalogue default.

    Need a site-specific selection? Share your duty data through the inquiry form on apextowerchina.com and our engineering team will review it.

  • Closed-Circuit Cooling Towers for Process Water: When Buyers Should Consider Them

    Quick Answer: Closed-circuit cooling towers are worth considering when process water should stay isolated from air, when fouling control matters, or when the system needs cleaner circulating water than an open tower can provide.

    For industrial buyers, the choice between open and closed circuit cooling affects water treatment, maintenance, heat exchanger protection, and long-term operation. The best choice depends on the full process and site condition.

    Key Engineering Inputs to Confirm

    InputWhy It MattersWhat to Send THERMIVON
    Process sensitivitySome equipment requires cleaner circulating waterEquipment type and water cleanliness requirement
    Fouling riskDirty environments may affect open water loopsDust, solids, oil mist, or process contamination risk
    Water treatment planTreatment strategy affects lifecycle operationWater quality and treatment standard
    Thermal dutyClosed circuit selection still depends on heat rejection dutyFlow, hot/cold water temperatures, wet-bulb
    Maintenance preferenceAccess and cleaning strategy influence system choiceMaintenance interval and service constraints

    Practical Selection Steps

    1. Identify whether process water can contact air or must remain isolated.
    2. Check whether connected equipment is sensitive to scaling, fouling, or contamination.
    3. Compare lifecycle maintenance requirements, not only initial equipment cost.
    4. Confirm whether the project has enough footprint and airflow clearance.
    5. Send full duty data before final model selection.

    Common Mistakes to Avoid

    • Choosing closed circuit only because it sounds more advanced.
    • Choosing open circuit only because the initial price appears lower.
    • Ignoring water quality and connected equipment sensitivity.
    • Comparing supplier models without matching design wet-bulb and outlet water temperature.

    Related Cooling Tower Resources

    For a project-specific recommendation, send your duty data, site conditions, and any layout drawings through the Get a Quote form or contact THERMIVON directly.

    FAQ

    Is a closed-circuit tower always better than an open-circuit tower?

    No. Closed circuit towers help isolate process water, but open circuit towers can be suitable and cost-effective when water contact and treatment are acceptable.

    What industries use closed-circuit cooling towers?

    They are commonly considered for process water systems where loop isolation, water cleanliness, or equipment protection is important. Final suitability depends on project review.

    What should I send for closed-circuit tower selection?

    Send flow rate, hot and cold water temperatures, design wet-bulb temperature, process fluid details, site altitude, water quality, material preference, and layout drawings if available.

  • Cooling Tower Noise Control for Industrial Projects: Buyer Planning Guide

    Quick Answer: Cooling tower noise control should be planned before purchase by confirming the site noise target, tower location, fan configuration, airflow path, nearby boundaries, operating schedule, and maintenance access.

    Noise is often discovered too late in industrial cooling tower projects. Early planning helps buyers avoid retrofit costs and gives suppliers enough information to review fan, layout, and enclosure options.

    Key Engineering Inputs to Confirm

    InputWhy It MattersWhat to Send THERMIVON
    Noise targetDefines whether standard or low-noise configuration is neededdB(A) limit and measurement distance
    Tower locationNearby offices, residences, or boundaries affect riskSite plan or rooftop position
    Operating scheduleNight operation may require tighter controlDay/night runtime and load profile
    Airflow clearancePoor airflow can increase operating stressClearance around intake and discharge
    Maintenance accessNoise treatment must not block service workAccess side and safety restrictions

    Practical Selection Steps

    1. Confirm the required sound level and measurement point before RFQ.
    2. Identify sensitive boundaries, offices, residences, or roof areas nearby.
    3. Review fan arrangement and airflow direction during layout planning.
    4. Avoid placing the tower where walls or corners reflect noise back to occupied zones.
    5. Ask for engineering review before adding site-built barriers or acoustic screens.

    Common Mistakes to Avoid

    • Treating noise control as a final installation detail instead of an RFQ input.
    • Adding barriers that restrict airflow and reduce thermal performance.
    • Comparing noise data without checking measurement distance and operating condition.
    • Ignoring maintenance access when designing acoustic treatment.

    Related Cooling Tower Resources

    For a project-specific recommendation, send your duty data, site conditions, and any layout drawings through the Get a Quote form or contact THERMIVON directly.

    FAQ

    Can a cooling tower be made quieter?

    Noise can often be reduced through fan selection, layout, operating strategy, and acoustic planning, but the right option depends on project duty and site constraints.

    What noise information should buyers send?

    Send the required dB(A) limit, measurement distance, tower location, sensitive boundaries, operating schedule, and any local regulation or project specification.

    Do acoustic barriers always help?

    Not always. A barrier that restricts airflow can hurt cooling performance, so barrier design should be reviewed together with airflow and maintenance access.

  • Cooling Tower RFQ Checklist: What Overseas Buyers Should Send First

    Quick Answer: A useful cooling tower RFQ should include flow rate, hot and cold water temperatures, wet-bulb temperature, project country, site altitude, power supply, noise target, water quality, material preference, and drawings if available.

    A clear RFQ reduces back-and-forth, avoids wrong model comparisons, and helps engineering teams review cooling tower duty faster. This checklist is designed for overseas factories, EPC contractors, and system integrators.

    Key Engineering Inputs to Confirm

    InputWhy It MattersWhat to Send THERMIVON
    Capacity or heat loadPrevents undersizing or misleading tonnage comparisonTR, kW, kcal/h, or process heat load
    Flow and temperaturesCore basis for thermal dutym³/h plus hot/cold water temperature
    Location dataWet-bulb, altitude and power supply affect selectionCountry, city, altitude, voltage and frequency
    Drawing filesHelps check footprint and pipe directionPDF, DWG, JPG, or layout sketch
    Project priorityGuides engineering trade-offsNoise, footprint, maintenance, budget, or delivery priority

    Practical Selection Steps

    1. Start with the operating duty instead of asking only for a general price.
    2. Add project location and environmental data for realistic selection.
    3. State whether the tower will serve process cooling, HVAC, data center, or utility duty.
    4. Attach layout drawings or installation photos if the site is constrained.
    5. Use the RFQ form so the engineering team receives the information in one place.

    Common Mistakes to Avoid

    • Sending only “100 ton cooling tower price” without design temperatures.
    • Mixing refrigeration tons, cooling tower tons, and heat load without units.
    • Not stating whether the system needs open circuit or closed circuit cooling.
    • Omitting voltage, frequency, noise limit, or available installation space.

    Related Cooling Tower Resources

    For a project-specific recommendation, send your duty data, site conditions, and any layout drawings through the Get a Quote form or contact THERMIVON directly.

    FAQ

    Can I request a quotation without complete data?

    Yes, but the first reply will normally ask for missing duty and site data. Final selection should follow engineering review.

    Why does wet-bulb temperature matter?

    Cooling towers reject heat by evaporation, so design wet-bulb temperature strongly affects achievable outlet water temperature and model size.

    Should I attach a drawing?

    If available, drawings help check footprint, airflow clearance, pipe direction, and maintenance access before quotation.

  • Cooling Tower Selection for Chemical Plants: Engineering Inputs Buyers Should Prepare

    Quick Answer: Chemical plant cooling tower selection should start with heat load, water flow, hot and cold water temperatures, design wet-bulb temperature, water quality, material preference, and site restrictions.

    Chemical plants often need reliable process cooling under continuous duty. The right cooling tower type depends on the process loop, fouling risk, corrosion environment, maintenance access, noise target, and lifecycle service plan.

    Key Engineering Inputs to Confirm

    InputWhy It MattersWhat to Send THERMIVON
    Water flowDefines pump and tower hydraulic dutym³/h or GPM, with operating range
    Hot / cold water temperatureDetermines range and cooling dutyInlet and outlet water temperatures
    Design wet-bulb temperatureSets realistic tower approachLocal design wet-bulb and ambient conditions
    Water qualityAffects scaling, corrosion, and material choiceWater analysis or known contaminants
    Site layoutImpacts airflow, maintenance, and installationRoof or ground layout drawing if available

    Practical Selection Steps

    1. Confirm whether the process loop can contact air or requires a closed circuit.
    2. Calculate the heat rejection duty from flow rate and temperature range.
    3. Define realistic design wet-bulb temperature for the project location.
    4. Review water quality and corrosion exposure before selecting materials.
    5. Send layout restrictions, noise requirements, and power supply for engineering review.

    Common Mistakes to Avoid

    • Selecting by nominal tonnage without checking wet-bulb temperature.
    • Ignoring chemical vapor, corrosion exposure, or water treatment conditions.
    • Comparing suppliers without confirming whether quotes use the same design assumptions.
    • Leaving airflow clearance and maintenance access until the installation stage.

    Related Cooling Tower Resources

    For a project-specific recommendation, send your duty data, site conditions, and any layout drawings through the Get a Quote form or contact THERMIVON directly.

    FAQ

    Should a chemical plant use an open or closed circuit cooling tower?

    It depends on whether the process water can contact air. Closed circuit towers help isolate process fluid, while open circuit towers can be cost-effective when water contact and treatment are acceptable.

    What data is needed for a cooling tower quotation?

    THERMIVON normally needs water flow, hot and cold water temperatures, design wet-bulb temperature, project country, power supply, site layout, noise target, water quality, and material preference.

    Can THERMIVON provide final model selection from limited information?

    A preliminary direction may be discussed, but final model selection should follow engineering review of project duty and site conditions.

  • FRP vs. Steel Cooling Tower Guide for Industrial Buyers

    FRP vs. Steel Cooling Tower Guide for Industrial Buyers

    Author: THERMIVON Engineering Sales   |   Last updated: July 16, 2026

    Featured image placeholder: Use an authorized FRP tower, galvanized steel tower or material comparison image before publishing.

    Quick Answer

    When buyers search for an FRP cooling tower manufacturer or a steel cooling tower manufacturer, the real issue is usually material fit. FRP and steel are not interchangeable by default. Material choice should be reviewed against corrosion environment, maintenance plan, structural preference, transport conditions and project lifecycle priorities.

    FRP vs. Steel Cooling Tower Review Table

    Material directionWhat buyers usually care aboutWhat should be reviewed
    FRP cooling towerCorrosion resistance and long-term exposure conditionsProject environment, maintenance expectations and structural preference
    Steel cooling towerConstruction approach, cost structure and plant preferenceProtective finish, environment, lifecycle plan and service conditions

    Why This Material Keyword Matters

    Material-specific searches are usually not casual traffic. They often come from buyers who already know the project direction and are comparing supplier options or trying to confirm whether a material preference is justified. That makes the content commercially useful if it stays realistic and engineering-led.

    Questions to Answer Before Choosing FRP or Steel

    • What is the project environment and corrosion exposure?
    • What maintenance level can the owner realistically support?
    • Is structural weight a concern?
    • Are there owner or consultant material preferences?
    • Is the tower for replacement, new installation or export stock planning?
    • What are the water quality and operating continuity requirements?

    Common Errors in Material-Based RFQs

    • Asking only for FRP or only for steel without explaining why
    • Ignoring water chemistry and site corrosion conditions
    • Comparing materials without normalizing the same duty basis
    • Assuming material alone decides lifecycle cost
    • Skipping logistics and installation handling considerations

    Related THERMIVON Pages

    FAQ

    Is FRP always better than steel for a cooling tower?

    No. The better material depends on the project environment, maintenance plan, structural preference and owner requirements.

    What should I send when asking for an FRP or steel cooling tower quote?

    Send duty data, wet-bulb temperature, project location, water quality notes, material preference reason and any layout or noise requirement.

    Can THERMIVON recommend FRP or steel from one-line inquiry text?

    A preliminary direction may be possible, but final material recommendation should follow a proper project review.

    Related Articles

    Next step: If you already have project data, Get a Quote and include flow, hot/cold water temperatures, design wet-bulb temperature, site altitude, power supply, noise target, water quality and material preference.

  • Cooling Tower Factory RFQ Guide for Overseas Buyers

    Cooling Tower Factory RFQ Guide for Overseas Buyers

    Author: THERMIVON Engineering Sales   |   Last updated: July 16, 2026

    Featured image placeholder: Use an authorized production line, dispatch or factory inspection image before publishing.

    Quick Answer

    If you are searching for a cooling tower factory, you are usually at the supplier-screening stage, not the learning stage. A useful factory evaluation starts with project data, but it also checks response quality, material options, production discipline, export readiness and how the factory team handles technical clarification before quotation.

    Cooling Tower Factory Evaluation Table

    Check pointWhy it mattersWhat to verify
    Technical screeningA factory that asks the right questions reduces mismatch riskRFQ checklist and duty review process
    Product family coverageBuyer may need open, closed, FRP or steel optionsAvailable series and typical applications
    Manufacturing clarityConfirms whether the factory can support repeated project workCommercial response structure and revision control
    Export supportImportant for overseas procurementPacking and document support
    Communication speedFast and clear follow-up helps project timingHow missing data is identified and requested

    What Overseas Buyers Should Send to a Cooling Tower Factory

    • Flow and hot / cold water temperatures
    • Design wet-bulb temperature and site altitude
    • Project country
    • Power supply
    • Noise target
    • Water quality notes
    • Material preference
    • Any OEM or distributor context

    Why This Keyword Is Stronger Than General Traffic

    Someone searching for cooling tower factory is usually not looking for a broad educational page. The search often comes from sourcing teams, trading companies, engineering contractors or channel partners looking for a factory-side supplier relationship. That makes the page useful for commercial-intent capture when the content stays practical.

    Factory RFQ Mistakes That Slow the Deal

    • Sending only “Please quote your best price” without technical duty
    • Not clarifying whether the need is direct project supply or OEM
    • Using vague climate data instead of project wet-bulb temperature
    • Skipping material and water-quality discussion
    • Comparing suppliers without normalizing the same design basis

    Related THERMIVON Pages

    FAQ

    What should I ask a cooling tower factory before requesting price?

    Ask what project inputs the factory needs for selection, what product families are available, and how export or OEM requirements are handled.

    Does factory sourcing always mean lower total project risk?

    Not automatically. The better supplier is the one that combines manufacturing capability with clear engineering communication and practical project support.

    Can THERMIVON review factory-style RFQs for overseas projects?

    Yes. THERMIVON can review RFQs that include project duty, site data and commercial scope, then respond based on the provided information.

    Related Articles

    Next step: If you already have project data, Get a Quote and include flow, hot/cold water temperatures, design wet-bulb temperature, site altitude, power supply, noise target, water quality and material preference.

  • Cooling Tower Sizing Checklist Before RFQ Submission

    Cooling Tower Sizing Checklist Before RFQ Submission

    Author: THERMIVON Engineering Sales   |   Last updated: July 16, 2026

    Featured image placeholder: Use an authorized engineering worksheet, cooling tower product or project review image before publishing.

    Quick Answer

    Cooling tower sizing starts with operating data, not with a random model list. For preliminary review, the buyer should provide water flow, hot and cold water temperatures, design wet-bulb temperature, site altitude and any layout or noise limit. Those inputs are the basis for early engineering selection.

    Cooling Tower Sizing Inputs

    InputWhy it mattersComment
    Water flowDefines how much water must be cooledUse actual process or condenser flow
    Hot water temperatureDefines entering conditionState normal design value
    Cold water temperatureDefines leaving targetNeeded for range calculation
    Wet-bulb temperatureCritical for evaporative tower sizingUse design wet-bulb, not dry-bulb
    AltitudeAffects air density and selection reviewImportant for some project locations
    Site limitsAffects final practical configurationFootprint, height, access and noise

    Why Buyers Search “Cooling Tower Sizing”

    This is often a mid-to-high intent engineering keyword. The searcher is usually preparing to compare models, request a quotation or validate whether an existing tower is undersized. Good content for this query should bridge technical screening and commercial RFQ readiness.

    Preliminary Sizing Formula Reminder

    At an early stage, buyers often estimate heat rejection from water flow and temperature range. That can be useful for screening, but final model selection still depends on the complete design basis, including wet-bulb temperature, water distribution pattern, tower family and real project constraints.

    What Buyers Should Send Instead of “Please Recommend a Model”

    • Flow rate
    • Hot and cold water temperatures
    • Project wet-bulb temperature
    • Installation location and altitude
    • Power supply
    • Noise target
    • Water quality and material preference
    • Any replacement or retrofit background

    Common Sizing Mistakes

    • Using dry-bulb temperature instead of wet-bulb temperature
    • Sending heat load without the flow and temperature basis
    • Ignoring future expansion or peak load conditions
    • Assuming a physically larger tower is always the better answer
    • Not checking site restrictions until after selection discussion starts

    Related THERMIVON Pages

    FAQ

    What is the most important value in cooling tower sizing?

    There is no single value. Flow, hot and cold water temperatures and design wet-bulb temperature must be reviewed together.

    Can a cooling tower be sized correctly from tonnage only?

    Not reliably. Tonnage alone is not enough for final engineering selection without the supporting duty and ambient data.

    What should I send THERMIVON for sizing review?

    Send flow, entering and leaving temperatures, wet-bulb temperature, altitude, power supply, noise target and any site limitation or material preference.

    Related Articles

    Next step: If you already have project data, Get a Quote and include flow, hot/cold water temperatures, design wet-bulb temperature, site altitude, power supply, noise target, water quality and material preference.