Quality & Manufacturing

Apex towers are built by qualified partner factories in China that specialise in FRP and steel cooling towers. Apex manages each order from selection to shipment: we confirm the technical specification with the factory, follow production, arrange inspection and collect the test and shipping documents for your project file.

How each order is checked

1. Specification and drawing confirmation · 2. Incoming material check (FRP, steel, coil, fill, fan, motor) · 3. Coil pressure test (closed-circuit towers) · 4. Pre-assembly / fit-up check · 5. Final inspection and photo record · 6. Packing and loading photos

Inspection options for buyers

Third-party inspection (e.g. SGS, BV, TÜV) at the buyer’s choice and cost · Factory witness testing by the buyer or its consultant, by appointment · Photo and video reports at each production stage

Documents per order

Order-specific test and inspection records · Packing list and loading photos · CTI documentation for eligible series on request

Warranty

16 months from shipment or 12 months from commissioning, whichever comes first. Full terms are stated in each quotation.

Response time

Reply within 24 hours; quotation within 2–3 working days.

V-type dry cooler assembly workshopGalvanized steel profiles and structural parts at the partner factory (1)Cooling tower modules during assembly at the partner factory (1)Finished cooling tower units ready for final inspection (1)Cooling tower units packed and loaded for shipment (1)

Production & Delivery · Certificates

Our commitments

Reply within 24 hours; quotation within 2–3 working days.

Warranty: 16 months from shipment or 12 months from commissioning, whichever comes first.

Third-party inspection and factory witness testing welcome.

Designed per CTI methods; CTI-certified manufacturing available on request (project-specific documentation).

Get a Quote