Partner-Factory Production & Delivery
Apex cooling towers are manufactured by qualified partner factories in China. The photos below show typical production, inspection and shipping stages for towers we supply. Customer names and sites are not disclosed.
From fabrication to shipment
Fabrication
Steel profiles and structural parts are cut, formed and galvanized.
Fabrication
Fabrication
Fabrication
Components
Fill, water distribution, fan and drive assemblies.
Components
Components
Components
Assembly
Modules are assembled and checked for fit-up before dispatch.
Assembly
Assembly
Assembly
Assembly
Final inspection
Finished units are inspected and photographed. Third-party inspection and factory witness testing welcome.
Final inspection
Final inspection
Final inspection
Final inspection
Packing & shipping
Units are protected, loaded and secured for transport.
Packing & shipping
Packing & shipping
Packing & shipping
Packing & shipping
Applications
Data Centers
Closed-circuit towers keep the process loop clean; sized for N+1 at your design wet-bulb.
District Cooling
Multi-cell open towers for high wet-bulb plants, often on TSE make-up water.
HVAC & Buildings
Crossflow and counterflow towers for chiller plants in commercial and public buildings.
Industrial Process
Open or closed circuit cooling for process loops, compressors and furnaces.
Power
Auxiliary cooling for generators, lube oil and plant cooling water.
Oil & Gas
Steel or FRP towers with corrosion-resistant options for refinery and gas plant duty.
Our commitments
Reply within 24 hours; quotation within 2–3 working days.
Warranty: 16 months from shipment or 12 months from commissioning, whichever comes first.
Third-party inspection and factory witness testing welcome.
Designed per CTI methods; CTI-certified manufacturing available on request (project-specific documentation).