Cooling Towers for Hotels, Hospitals & Campuses
Apex evaluates HVAC cooling tower choices against the design flow, wet-bulb condition, noise limit, footprint and maintenance access. SRN and SCT are starting points for engineering comparison.
Selection inputs
Send heat load or water flow, entering and leaving temperatures, design wet-bulb, city and altitude, make-up water analysis, power supply, sound target and site drawings. Apex engineering will confirm a duty-specific selection.
Middle East selection guide · Compare series · Get a Quote
Delivery Commitments
- 16-Month Warranty
- Quote in 2-3 Working Days
- Reply Within 24 Hours
- Third-Party Inspection
- Factory Witness Welcome