Cooling Towers for Oil, Gas & Petrochemical Plants
For process and utility cooling in oil and gas projects, material selection, water quality and site conditions must be reviewed together. Compare SCT steel counterflow and SCC closed-circuit configurations; no model is selected without the complete duty.
Selection inputs
Send heat load or water flow, entering and leaving temperatures, design wet-bulb, city and altitude, make-up water analysis, power supply, sound target and site drawings. Apex engineering will confirm a duty-specific selection.
Middle East selection guide · Compare series · Get a Quote
Delivery Commitments
- 16-Month Warranty
- Quote in 2-3 Working Days
- Reply Within 24 Hours
- Third-Party Inspection
- Factory Witness Welcome