Industrial Process Cooling Towers

Process cooling can require either open-circuit heat rejection or closed-loop fluid isolation. SCC and SCT families are compared only after water quality, process temperatures and site limits are known.

Selection inputs

Send heat load or water flow, entering and leaving temperatures, design wet-bulb, city and altitude, make-up water analysis, power supply, sound target and site drawings. Apex engineering will confirm a duty-specific selection.

Middle East selection guide · Compare series · Get a Quote

Delivery Commitments

  • 16-Month Warranty
  • Quote in 2-3 Working Days
  • Reply Within 24 Hours
  • Third-Party Inspection
  • Factory Witness Welcome