Quick Answer: Cooling tower size is driven by approach (cold-water temperature minus entering wet-bulb) and range (hot-water temperature minus cold-water temperature), together with water flow and site wet-bulb. Catalogue models rated at a fixed reference condition still need reselection when your process temperatures or wet-bulb differ.
Overseas B2B buyers often receive a quotation based on a standard duty such as 37/32/28 °C. That string is hot water / cold water / wet-bulb. The 5 °C gap between 37 and 32 is the range; the 4 °C gap between 32 and 28 is the approach. Changing either value changes the required tower—even when flow (m³/h) stays the same.
What Approach and Range Mean on a Project
Range is set by the process: how much the water must be cooled between return and supply. A wider range means more heat rejected per cubic metre of water, but it also changes fill and fan duty. Do not stretch range on paper just to shrink flow without checking pump and process constraints.
Approach is how close cold water gets to the entering wet-bulb. A tighter approach (for example aiming for cold water only 3 °C above wet-bulb instead of 4–5 °C) needs a larger tower or more cells for the same flow. Evaporative towers cannot cool water below the entering wet-bulb; approach is the practical margin above that physical limit.
Why Catalogue Ratings Are Not Plug-and-Play
Many open-circuit and closed-circuit lines are designed per CTI methods and published at a reference duty so buyers can compare vendors. That reference is a common language, not a guarantee for your site. If your cold-water target is lower, your wet-bulb is higher, or your range is narrower, ask for a thermal reselection rather than scaling a catalogue model by flow alone.
| Buyer input | What it controls | What to send the vendor |
|---|---|---|
| Hot / cold water (°C) | Range and target cold water | Process supply and return temperatures at design load |
| Design wet-bulb (°C) | Approach and summer peak size | Site design wet-bulb and basis (e.g. 1% exceedance) |
| Water flow (m³/h) | Heat rejection with range | Design flow and whether parallel trains exist |
| Altitude / pressure | Air density and evaporative performance | Site elevation (m) or design barometric pressure |
| Noise / footprint limits | Fan speed, cell count, layout | Sound target at a stated distance; plot constraints |
Practical Checks Before You Freeze the Model
- Write approach and range explicitly next to the hot/cold/wet-bulb string so every party uses the same numbers.
- Confirm whether the quoted model was selected at your site wet-bulb or only at a catalogue reference.
- If the process can accept a slightly higher cold-water temperature in peak summer, say so—relaxed approach often reduces capital cost more than chasing a tiny flow change.
- Keep water quality and make-up source in the same RFQ; fouling and blowdown affect long-term approach even when the thermal sheet looks fine on day one.
- Ask for the selection basis on the datasheet (wet-bulb, altitude, fouling allowance) so commissioning teams can verify performance later.
How THERMIVON Uses These Inputs
THERMIVON China sizes industrial open- and closed-circuit cooling towers from the duty you provide—not from a generic brochure pick. Send hot water, cold water, design wet-bulb, flow, altitude, and any noise or layout limits. We return a thermal selection and layout options so EPC and plant teams can compare approach, range, and cell arrangement on equal footing.
Need a quick check of approach and range for an overseas project? Share the duty data with the THERMIVON team at apextowerchina.com and we will confirm whether a catalogue reference model still fits your site.