Cooling Tower RFQ Checklist: What Overseas Buyers Should Send First

Cooling Tower RFQ Checklist: What Overseas Buyers Should Send First

Quick Answer: A useful cooling tower RFQ should include flow rate, hot and cold water temperatures, wet-bulb temperature, project country, site altitude, power supply, noise target, water quality, material preference, and drawings if available.

A clear RFQ reduces back-and-forth, avoids wrong model comparisons, and helps engineering teams review cooling tower duty faster. This checklist is designed for overseas factories, EPC contractors, and system integrators.

Key Engineering Inputs to Confirm

InputWhy It MattersWhat to Send Apex
Capacity or heat loadPrevents undersizing or misleading tonnage comparisonTR, kW, kcal/h, or process heat load
Flow and temperaturesCore basis for thermal dutym³/h plus hot/cold water temperature
Location dataWet-bulb, altitude and power supply affect selectionCountry, city, altitude, voltage and frequency
Drawing filesHelps check footprint and pipe directionPDF, DWG, JPG, or layout sketch
Project priorityGuides engineering trade-offsNoise, footprint, maintenance, budget, or delivery priority

Practical Selection Steps

  1. Start with the operating duty instead of asking only for a general price.
  2. Add project location and environmental data for realistic selection.
  3. State whether the tower will serve process cooling, HVAC, data center, or utility duty.
  4. Attach layout drawings or installation photos if the site is constrained.
  5. Use the RFQ form so the engineering team receives the information in one place.

Common Mistakes to Avoid

  • Sending only “100 ton cooling tower price” without design temperatures.
  • Mixing refrigeration tons, cooling tower tons, and heat load without units.
  • Not stating whether the system needs open circuit or closed circuit cooling.
  • Omitting voltage, frequency, noise limit, or available installation space.

Related Cooling Tower Resources

For a project-specific recommendation, send your duty data, site conditions, and any layout drawings through the Request a Quote form or contact Apex Tower directly.

FAQ

Can I request a quotation without complete data?

Yes, but the first reply will normally ask for missing duty and site data. Final selection should follow engineering review.

Why does wet-bulb temperature matter?

Cooling towers reject heat by evaporation, so design wet-bulb temperature strongly affects achievable outlet water temperature and model size.

Should I attach a drawing?

If available, drawings help check footprint, airflow clearance, pipe direction, and maintenance access before quotation.